Quotes for the same kitchen differ mainly because they are not for the same kitchen. The usual gaps are door finish and thickness, carcass board, hardware brand, what counts as included (fillers, plinths, end panels, packing), and the trade term. Put every quote on one specification and one trade term before comparing totals.
Nine lines that change a cabinet quote
| Line | How it varies between quotes | What to ask |
|---|---|---|
| Door finish | Melamine quoted where PET or lacquer was drawn | Finish, film or paint system, door thickness |
| Carcass board | Standard board in place of moisture-resistant; thinner panels | Board type, thickness, emission grade |
| Back panel | Thin unfinished back in place of a faced, grooved back | Thickness and whether it is faced |
| Hardware | Unbranded hinges and runners priced against branded | Brand and model for hinges and runners |
| Drawers | Board drawer boxes against steel-sided systems | Drawer box type and load rating |
| Fillers, plinths, end panels | Left out and added later as extras | A list of every loose part included |
| Countertops | Included in one quote, excluded in another | Whether tops are in the total |
| Packing | Basic cartons against export packing with corner guards | Carton grade, door protection |
| Trade term | EXW, FOB and CIF compared as if equal | Named port and who pays export costs |
How to put two quotes on the same basis
- 01YouFix one specificationWrite finish, board and hardware once.
- 02YouSend it to each supplierSame drawings, same spec sheet.
- 03YouAsk for itemised linesPer unit, not one lump sum.
- 04YouAlign the trade termAll FOB, or all to your port.
- 05YouCheck the loose partsFillers, plinths, panels, packing.
- 06YouCompare line by lineThen compare the totals.
What our quote includes and excludes
| Item | In the quote | Notes |
|---|---|---|
| Carcasses, doors and drawer fronts | Included | Listed per unit with its code from the drawing |
| Hinges, runners, legs and fixings | Included | Brand and model stated |
| Fillers, plinths, end panels, cornices | Included | Listed as separate lines |
| Export packing and labelling | Included | Room and unit code on every carton |
| Production drawings and inspection | Included | Shown as a service line |
| Countertops and basins | Optional | Separate line; can be removed |
| Handles | Optional | Or drilled for handles you supply |
| Appliances, sinks, taps | Not supplied | Openings sized to your models |
| Ocean freight, duty, delivery, installation | Not included under FOB | Freight can be quoted separately on request |
When the cheaper quote is the right one
A lower total is not a warning sign in itself. If the specification is written out and matches, a cheaper quote may reflect a simpler finish that suits the project, or a supplier with lower overheads.
It is a warning sign when the specification is vague: “standard board”, “quality hardware”, no thicknesses, no brand names. A vague quote cannot be held to anything at inspection.
Ask what happens when a unit fails inspection, and who pays. A quote that includes unit-by-unit inspection and rework is not comparable with one that does not.
Why Cabinet Quotes Differ: FAQ
Why is one quote per metre and another per unit?
Per-metre prices are estimates for comparing finishes. A per-unit quote is drawn from your actual layout. Only per-unit quotes can be compared reliably.
Can you quote to match another supplier’s specification?
Yes. Send their quote or spec sheet and we price the same specification, then show where ours would differ and why.
Is FOB or CIF better for comparing quotes?
FOB. Freight rates change weekly and vary by forwarder, so including them hides the difference in the cabinets themselves.
