Skip to content
tape measure, square and a door sample on a workbench
Solutions · Contractors

Cabinet Supply for Contractors and Builders

Unit-coded cabinets delivered to match your install sequence, priced per unit type, inspected before they ship.

Labelling
Per unit
Design rendering
Short answer

We supply contractors with kitchens, wardrobes and vanities priced per unit type, labelled per apartment and shipped in install order. You get one itemised bid for the whole cabinet package, with the production schedule counted from approved drawings.

A good fit if you

  • Have architect drawings or a bid package
  • Need cabinets labelled by apartment and room

Not the right fit if you

  • Want us to install on site
  • Need local showroom support
01

A typical contractor order

Illustrative example
Spaces
Kitchen · vanity · wardrobe
Finish
PET matte
A typical contractor order
Unit typeScope
Type A · 2-bedL-kitchen, 1 vanity, 2 wardrobes
Type B · 3-bedU-kitchen, 2 vanities, 3 wardrobes
Type C · cornerL-kitchen + island, 2 vanities, 3 wardrobes
02

Who handles what on a contractor order

Responsibilities on a contractor order
StepWhoDeliverable
Bid drawingsYouArchitect set / bid package
Shop drawingsWeUnit-type drawing set
Site measureYouConfirmed dimensions
ProductionFactoryWeekly photos
InspectionWeReport per unit type
Labelling & loadingWeUnit-coded packing list
InstallYouOn site
03

How a contractor order runs

  1. 01You
    Send drawingsFloor plan, elevations or a measured sketch.
  2. 02We
    Drawings & quoteWe convert to production drawings and itemise.
  3. 03You
    Approve & depositSign off drawings, samples and price.
  4. 04Factory
    ProductionEach category built at a specialist partner.
  5. 05We
    InspectionUnit-by-unit check against drawings.
  6. 06We
    Consolidate & shipOne container, one bill of lading.

Each step in detail: how it works →

04

Guides for contractors

05 — FAQ

Contractor questions

Can you ship in phases?

Yes. We split production by building or floor and ship each phase as a separate container.

How do you handle site measure changes?

Shop drawings are released only after you confirm site dimensions. Changes after release are quoted as variations.

Do you provide install instructions?

Yes. Each unit type gets an assembly sheet and labelled hardware bags.

Start a project

Send your bid package.

Unit-type pricing for the full cabinet scope.