Custom Cabinet Lead Time from China, Stage by Stage

How long each stage takes from first drawings to delivery, when the clock starts, and what moves the date.

Clock starts
Approval + deposit
Stages
6
Design rendering
Short answer

Production time is stated in your quotation and depends mainly on finish: lacquer, veneer and solid wood take longest. The clock starts when the deposit, final drawings, samples and hardware are all approved, not at first contact. Drawings and quoting come before; inspection, loading and sea freight are scheduled separately.

01

Timeline by stage

Timeline by stage
StageWhoDepends on
QuoteWeCompleteness of drawings
Production drawingsWeNumber of unit types, revisions
Approval and depositYouSite dimensions, samples
ProductionFactoryFinish, order size, season
Inspection and consolidationWeRework, number of factories
Sea freightCarrierRoute and transhipment
Production days are counted from signed drawings and cleared deposit.
02

Who has to do what to hold the date

Who has to do what to hold the date
ActionWhoEffect on the schedule
Send complete drawings and appliance modelsYouAvoids re-quoting and redrawing
Issue quote and shop drawingsWeStarts your approval period
Sign drawings and pay the depositYouStarts the production clock
Book materials and line timeFactoryFixes the production slot
Track progress weeklyWeFlags slippage while it can be recovered
Inspect and consolidateWeClears goods for loading
Pay the balance and book freightYouReleases the container
03

What each finish adds to production time

What each finish adds to production time
FinishWhy
MelamineCut and edge-band only
PETLaminating step
PVC thermofoilRouting and vacuum pressing
Acrylic / UV glossLaminating, careful handling
LacquerMultiple coats and curing
Wood veneerVeneer laying and lacquering
Solid woodTimber conditioning and finishing
04

What moves the date

Late drawing changes. A change after sign-off restarts the affected units, not the whole order, but it can hold the container.

Chinese New Year. Factories close for two to three weeks around late January or February and run at reduced capacity either side. Orders needed in March should be approved by early December.

Custom colour approval. Colour-matched lacquer cannot start until the sample panel is signed off.

Balance payment. Loading is booked once the inspection report is accepted and the balance is received.

05

Lead Time Explained: FAQ

When does the lead time start?

On the day both conditions are met: production drawings signed and deposit received.

Can you ship in phases?

Yes. Production is split by building, floor or phase, with a container for each.

Last reviewed: October 2026