Production time is stated in your quotation and depends mainly on finish: lacquer, veneer and solid wood take longest. The clock starts when the deposit, final drawings, samples and hardware are all approved, not at first contact. Drawings and quoting come before; inspection, loading and sea freight are scheduled separately.
Timeline by stage
| Stage | Who | Depends on |
|---|---|---|
| Quote | We | Completeness of drawings |
| Production drawings | We | Number of unit types, revisions |
| Approval and deposit | You | Site dimensions, samples |
| Production | Factory | Finish, order size, season |
| Inspection and consolidation | We | Rework, number of factories |
| Sea freight | Carrier | Route and transhipment |
Who has to do what to hold the date
| Action | Who | Effect on the schedule |
|---|---|---|
| Send complete drawings and appliance models | You | Avoids re-quoting and redrawing |
| Issue quote and shop drawings | We | Starts your approval period |
| Sign drawings and pay the deposit | You | Starts the production clock |
| Book materials and line time | Factory | Fixes the production slot |
| Track progress weekly | We | Flags slippage while it can be recovered |
| Inspect and consolidate | We | Clears goods for loading |
| Pay the balance and book freight | You | Releases the container |
What each finish adds to production time
| Finish | Why |
|---|---|
| Melamine | Cut and edge-band only |
| PET | Laminating step |
| PVC thermofoil | Routing and vacuum pressing |
| Acrylic / UV gloss | Laminating, careful handling |
| Lacquer | Multiple coats and curing |
| Wood veneer | Veneer laying and lacquering |
| Solid wood | Timber conditioning and finishing |
What moves the date
Late drawing changes. A change after sign-off restarts the affected units, not the whole order, but it can hold the container.
Chinese New Year. Factories close for two to three weeks around late January or February and run at reduced capacity either side. Orders needed in March should be approved by early December.
Custom colour approval. Colour-matched lacquer cannot start until the sample panel is signed off.
Balance payment. Loading is booked once the inspection report is accepted and the balance is received.
Lead Time Explained: FAQ
When does the lead time start?
On the day both conditions are met: production drawings signed and deposit received.
Can you ship in phases?
Yes. Production is split by building, floor or phase, with a container for each.