Measure the finished room, in millimetres, after plaster, tiles and flooring are in or their thicknesses are fixed. Take each wall length at three heights, the ceiling height at each corner, and the position of every window, door, pipe and socket from a fixed corner. Send appliance model numbers with the dimensions; the drawings are built around them.
The measuring checklist
From survey to sign-off
- 01YouRough dimensionsFrom plans or a first site visit. Enough for a quote.
- 02WeQuote and layoutDrawn to the rough dimensions.
- 03YouSite surveyMeasured in the finished room.
- 04WeProduction drawingsRedrawn to surveyed dimensions.
- 05YouCheck and signYour installer checks every dimension.
- 06FactoryRelease to productionCut to the signed drawings.
Measuring errors that cause remakes
| Error | What happens on site | How to avoid it |
|---|---|---|
| Measured before plaster or tiles | The run is too long for the finished wall | Survey the finished room, or state finish thicknesses |
| One wall length taken at floor level only | Tall units foul a wall that leans in | Measure at three heights and give the smallest |
| Ceiling height taken at one point | Tall units or cornices do not fit at the low end | Measure at each corner |
| Window sill height missed | Worktop or upstand clashes with the sill | Give sill height from finished floor |
| Appliance given by type, not model | Housing or opening is the wrong size | Send model numbers; we check the installation sheet |
| Pipes and sockets left off | Backs and shelves are cut on site | Mark every service on the survey |
| Inches and millimetres mixed | Whole units out by a conversion error | Use one unit throughout and say which |
How drawings allow for imperfect rooms
No room is square. Production drawings leave a planned gap at walls and ceilings, closed on site with filler and scribing panels that the installer trims to fit. The cabinets themselves are made to the stated size.
This means a survey that is a few millimetres out is absorbed. One that is tens of millimetres out is not: the filler runs out, and a unit has to be remade.
If the room is not yet built, cabinets can be drawn to the architect’s dimensions with wider fillers, on the understanding that the builder works to those dimensions.
How to Measure a Kitchen: FAQ
Who is responsible if the dimensions are wrong?
The cabinets are made to the drawings you sign. We check the survey for inconsistencies and query anything that does not add up, but we have not seen the room.
Can I measure in inches?
Yes, as long as the whole survey uses inches. Production drawings are issued in millimetres with your figures shown alongside.
Do I need a professional survey?
For a quote, no. Before production, have the person who will install the cabinets measure or check the room.
Can I send photos in place of drawings?
Photos help a great deal alongside dimensions. A hand sketch with measurements plus a photo of each wall is enough to start.
What if the appliance model changes after sign-off?
Tell us at once. If the affected unit has not been cut it is redrawn; if it has, that unit is remade at cost.