Orders are paid in stages: a deposit after you approve the production drawings, and the balance before loading, after you have received the inspection report. The percentages, currency and trade term are written in your quotation. Nothing is paid before drawings and price are agreed.
Payment schedule
| Milestone | Amount | What you have received first |
|---|---|---|
| Quote and drawings | Nothing due | Itemised quote, production drawings |
| Order confirmation | Deposit, as quoted | Signed drawings, approved samples, proforma invoice |
| Before loading | Balance | Inspection report with photos, packing list |
| After shipping | Nothing due to us | Bill of lading and shipping documents |
Order and payment sequence
- 01WeQuote and drawingsItemised price and production drawings issued.
- 02YouSign and pay depositAgainst the proforma invoice.
- 03FactoryProductionStarts when the deposit clears.
- 04WeInspection reportPhotos and findings sent to you.
- 05YouPay the balanceAfter you accept the report.
- 06WeLoad and releaseContainer loaded, documents issued.
Terms in detail
| Currency | USD |
|---|---|
| Trade term | EXW, FCA or FOB, place named; CIF on request |
| Beneficiary | Foshan Novisen Home Furnishing Co., Ltd., as shown on the proforma invoice |
| Price adjustment | Only for changes you request after sign-off |
| Sample fees | Credited against the first order |
Paying safely
Pay only to the company account named on the signed proforma invoice. If you receive new bank details by email, confirm them by phone or video call before sending anything.
The balance is not requested until the inspection report is issued. You, or an inspector you appoint, can verify the goods before paying it.
Bank charges at the sending end are paid by the buyer. Ask your bank to send the full invoice amount.
Payment Terms: FAQ
Is the deposit refundable?
Before production starts, the deposit is refunded less the cost of drawings and samples. After materials are cut, it is not.
Do prices change after I pay the deposit?
No. The price is fixed for the signed drawings. Only changes you request are re-quoted.
Can payment be split by phase?
Yes. Phased projects are invoiced per container, each with its own deposit and balance.
